Scoring PIM vendors

Score PIM vendors on a small number of weighted criteria that you fix before the demos. Everyone scores alone first, then you discuss the gaps. The scorecard does not make the decision, but it makes the reasons for it clear.

Start with Data research team
Last reviewed
November 20, 2026
What you will learn
  • Why the criteria must be fixed before you see any vendor
  • The six to eight criteria that matter, and how to weight them
  • A simple scoring scale that avoids false precision
  • How to use differences between scorers to find what was missed
  • How to read a close result and make the final call
What you will have

A completed scorecard for each vendor, a ranked result, and a short written reason for your first and second choice.

Time it takes

Half a day to set up the scorecard before demos, then a week after the last demo to score, discuss and check references.

Who to involve

Everyone who attended the demos scores. The decision maker joins the discussion of the results.

Fix the criteria before you see anything

If you choose what to score after the demos, you will score what impressed you. A slick interface or a memorable presenter can quietly reshape the criteria in your head. Agree the criteria and their weights before the first demo, write them down, and do not change them for one vendor.

What to score

Six to eight criteria is enough. A typical set:

CriterionWhat it coversYour weight
Fit to requirementsHow well it met your should requirements from the RFP and demo.
Demo tasksHow it performed against your script, with your data.
Ease of useWhether your own team could do the work unaided.
IntegrationHow it connects to the systems you named, and how much custom work that needs.
DeliveryThe implementation plan, the partner and the timescale.
Cost over three yearsLicence, implementation and running costs together.
VendorStability, support, references and product direction.
Total100

Weight them

Share one hundred points across the criteria. This forces the conversation that matters: is ease of use worth more than cost? Is integration more important than delivery? Most teams find that two or three criteria carry most of the weight, and that is useful to know. Agree the weights with the decision maker, because they are the decision maker's priorities expressed as numbers.

Score simply

Use a scale of one to five, with each number defined in words:

ScoreWhat it means
1Does not meet the need
2Partly meets it, with significant workarounds
3Meets it
4Meets it well
5Does better than we asked

Avoid ten-point scales. They give a false sense of precision and lead to arguments about whether something is a six or a seven.

Score alone, then together

Each person scores on their own and hands in the sheet before any discussion. Then look at where the scores differ most. A gap of two or more points on one criterion usually means someone saw something the others missed, or understood the requirement differently. Those conversations are the most valuable part of the exercise.

After the discussion, people may change their scores, but they should say why.

Check must-haves separately

A must-have is not scored. It is passed or failed. A vendor that fails one is out, however high its total. Check this before you add anything up, so nobody falls in love with a platform that cannot do what you need.

From our selectionsWhen the scores and the team's instinct disagree, do not quietly overrule the result. Ask what the scorecard is missing. It is usually a criterion that nobody wrote down, such as confidence in the partner. Name it, add it for every vendor and score again.

Take up references

After scoring, speak to references for your top two. Ask what went wrong in the project and how the vendor and partner dealt with it. Every project has something. Ask how long it took to go live compared to the plan, and whether they would choose the same platform again.

Read the result with care

If two vendors finish within a few points of each other, the scorecard is telling you they are equal on what you measured. Decide between them on references, the people you would work with and the commercial terms. Then write down why, in three sentences, so the decision can be explained a year from now to someone who was not in the room.

In summary
  • Agree criteria and weights before the first demo, and keep them fixed.
  • Six to eight criteria, weighted to one hundred, scored one to five.
  • Score alone first, then discuss the biggest gaps between scorers.
  • Must-haves are passed or failed, never scored.
  • Close results are decided on references, people and terms, with the reason written down.
Questions people ask

How much weight should cost have?

Usually between fifteen and twenty-five points out of a hundred. Lower, and you risk choosing something you cannot afford to run. Higher, and you risk choosing the cheapest platform that does not fit.

What if the highest score is not the one the team prefers?

Ask why. Either a criterion is missing or the weights were wrong. Name it, adjust it openly for every vendor, and score again. Do not quietly overrule the result.

When should we take up references?

After scoring, for your top two. Ask what went wrong in the project and how the vendor dealt with it. Every project has something.

Next
Next: budgeting for a PIMSee all twelve steps