Score PIM vendors on a small number of weighted criteria that you fix before the demos. Everyone scores alone first, then you discuss the gaps. The scorecard does not make the decision, but it makes the reasons for it clear.
A completed scorecard for each vendor, a ranked result, and a short written reason for your first and second choice.
Half a day to set up the scorecard before demos, then a week after the last demo to score, discuss and check references.
Everyone who attended the demos scores. The decision maker joins the discussion of the results.
If you choose what to score after the demos, you will score what impressed you. A slick interface or a memorable presenter can quietly reshape the criteria in your head. Agree the criteria and their weights before the first demo, write them down, and do not change them for one vendor.
Six to eight criteria is enough. A typical set:
| Criterion | What it covers | Your weight |
|---|---|---|
| Fit to requirements | How well it met your should requirements from the RFP and demo. | |
| Demo tasks | How it performed against your script, with your data. | |
| Ease of use | Whether your own team could do the work unaided. | |
| Integration | How it connects to the systems you named, and how much custom work that needs. | |
| Delivery | The implementation plan, the partner and the timescale. | |
| Cost over three years | Licence, implementation and running costs together. | |
| Vendor | Stability, support, references and product direction. | |
| Total | 100 |
Share one hundred points across the criteria. This forces the conversation that matters: is ease of use worth more than cost? Is integration more important than delivery? Most teams find that two or three criteria carry most of the weight, and that is useful to know. Agree the weights with the decision maker, because they are the decision maker's priorities expressed as numbers.
Use a scale of one to five, with each number defined in words:
| Score | What it means |
|---|---|
| 1 | Does not meet the need |
| 2 | Partly meets it, with significant workarounds |
| 3 | Meets it |
| 4 | Meets it well |
| 5 | Does better than we asked |
Avoid ten-point scales. They give a false sense of precision and lead to arguments about whether something is a six or a seven.
Each person scores on their own and hands in the sheet before any discussion. Then look at where the scores differ most. A gap of two or more points on one criterion usually means someone saw something the others missed, or understood the requirement differently. Those conversations are the most valuable part of the exercise.
After the discussion, people may change their scores, but they should say why.
A must-have is not scored. It is passed or failed. A vendor that fails one is out, however high its total. Check this before you add anything up, so nobody falls in love with a platform that cannot do what you need.
From our selectionsWhen the scores and the team's instinct disagree, do not quietly overrule the result. Ask what the scorecard is missing. It is usually a criterion that nobody wrote down, such as confidence in the partner. Name it, add it for every vendor and score again.
After scoring, speak to references for your top two. Ask what went wrong in the project and how the vendor and partner dealt with it. Every project has something. Ask how long it took to go live compared to the plan, and whether they would choose the same platform again.
If two vendors finish within a few points of each other, the scorecard is telling you they are equal on what you measured. Decide between them on references, the people you would work with and the commercial terms. Then write down why, in three sentences, so the decision can be explained a year from now to someone who was not in the room.
Usually between fifteen and twenty-five points out of a hundred. Lower, and you risk choosing something you cannot afford to run. Higher, and you risk choosing the cheapest platform that does not fit.
Ask why. Either a criterion is missing or the weights were wrong. Name it, adjust it openly for every vendor, and score again. Do not quietly overrule the result.
After scoring, for your top two. Ask what went wrong in the project and how the vendor dealt with it. Every project has something.
Twelve questions about your catalogue, suppliers and channels. No sign-up.