Writing PIM requirements

Good PIM requirements describe your products, suppliers and channels, not a list of features. Write them as things the platform must do with your data, mark which ones would rule a vendor out, and keep the whole document to a few pages.

Start with Data research team
Last reviewed
November 20, 2026
What you will learn
  • Why most PIM requirements documents fail to separate vendors
  • How to describe your situation so vendors can size the job
  • How to write requirements as tasks a vendor can be tested against
  • How to sort must, should and could so the must list stays short
  • The areas every PIM requirements document should cover
What you will have

A short requirements document a vendor can respond to, with your must-haves clearly separated from everything else.

Time it takes

Two to four weeks, including time to gather input from the wider group.

Who to involve

The product data people lead. IT writes the integration and security sections. Buyers, marketing and channel owners review.

Why most requirements documents fail

The usual approach is to collect every feature anyone can think of into a spreadsheet of three hundred rows and send it to every vendor. Every vendor then answers yes to almost all of them, and you have learned nothing. Worse, the long list hides the handful of things that genuinely matter to you.

Requirements are only useful if they separate one vendor from another. That means fewer of them, written more precisely, and based on your products rather than on a generic feature list.

Describe your situation first

Open the document with a page of facts a vendor needs to size the job. Much of this is already in the page you wrote in step one.

FactWhat to include
ProductsHow many sellable items, how many products if you group variants, and how fast that is growing.
CategoriesHow many, and how different their attributes are. A fashion range and a range of electrical components need very different structures.
SuppliersHow many send you data, how often, and in what form.
ChannelsEvery place the data goes: websites, marketplaces, retailer portals, print, data pools.
SystemsThe ERP, ecommerce platform and anything else it must connect to, by name and version.
PeopleHow many will use it, and what they do: create, enrich, approve, publish.
Languages and marketsWhere you sell and in which languages.

Write requirements as tasks

Replace feature names with what you need to get done, using your own products. A feature name invites a yes. A task invites a demonstration.

Instead ofWrite
Supports variantsHolds a jacket sold in six sizes and four colours, with shared description at product level and its own barcode, price and image for each variant
Supplier portalLets a supplier upload their own spreadsheet, shows them which values are missing or invalid, and lets them fix it before it reaches us
WorkflowSends a new product to the category manager for approval before it can be published to any channel
Marketplace connectorsPublishes our products to Amazon and one retailer portal in their required formats, without manual reformatting

A vendor can show you each of the tasks on the right. They cannot hide behind them.

Sort them into three groups

PriorityWhat it meansHow many
Must haveIf the platform cannot do this, it is out, however good it is at everything elseTen or fewer. If everything is a must, nothing is
Should haveMatters, and will be scoredMost of your requirements
Could haveNice to have, and will not decide anythingA few, so vendors know about them, but do not let them distract
A useful testFor each must-have, ask: would we really walk away from an otherwise perfect platform because of this? If the honest answer is no, it is a should.

The areas to cover

AreaWhat to cover
Data modelAttributes, categories, variants, bundles, and relationships between products such as spares, accessories and alternatives.
Getting data inSupplier files, imports from the ERP, validation rules, handling duplicates.
Working on dataWorkflow, approvals, bulk editing, completeness scoring, version history.
Images and documentsLinking assets to products, resizing, file types, volumes.
Getting data outChannels, formats, connectors, how often data is sent.
Languages and marketsTranslations, market-specific values, units.
Users and permissionsRoles, who can change what, audit trail.
Hosting, security and supportWhere it runs, how it is backed up, service levels, data ownership and exit.

Forty to sixty requirements across these areas is plenty for most businesses.

Gather input without losing control

Ask the wider group for input in a structured way: send them the areas and ask for their three most important needs in each, written as tasks. One person, usually the selection lead, then edits, merges duplicates and makes the final call on priorities. Requirements written by committee tend to grow without limit.

Test it before you send it

Give the document to someone outside the project. If they cannot tell you your three biggest problems after reading it, rewrite the opening page. Then check every must-have against the test above. A short, sharp document gets better answers from vendors, and is far easier to score against later.

In summary
  • Long feature lists get a yes from every vendor and separate nothing.
  • Open with a page of facts about your products, suppliers, channels, systems and people.
  • Write requirements as tasks with your own products, so vendors must demonstrate them.
  • Keep must-haves to ten or fewer; most requirements belong in should.
  • Forty to sixty requirements across eight areas is plenty, with one person owning the final list.
Questions people ask

How long should PIM requirements be?

A few pages. One page on your situation, then forty to sixty requirements across the main areas. Longer documents get skimmed by vendors and by your own team.

Who should write them?

The people who work with product data every day, with IT adding the integration and security sections. One person should own the document and make the final call on priorities.

Should we include requirements for the future?

Include what you are confident you will need within two years, and mark it as future. Do not let a possible need in five years decide a purchase you make today.

Not sure where to start? Build your shortlist in five minutes

Twelve questions about your catalogue, suppliers and channels. No sign-up.

Build my shortlist